Private label on a space capsule costs $1,500–3,500 in one-time setup, adds 10–15 days to a 15-working-day build, and starts at five units instead of one. It also moves legal responsibility: under EU Regulation 2024/3110 Article 26(1)(a), a company that places a pod on the market under its own name or trademark is treated as the manufacturer. Below is what that changes on the product, in the crate and on paper.
What private label changes, and what it does not
Three things change. The badge and serial plate carry your name and your numbering. The crate carries your stencil. The declaration and the commercial documents are issued by your company rather than ours. Everything else stays where it was.
What does not change is the build. A private-label M10 20 m² flat-pack capsule leaves the line on the same drawings, the same steel frame, the same wall and roof panel build-up and the same wet core as a unit carrying our badge. Assembly on site is still three to four people over two to three days, and the container pack is unchanged: two units of 20 m² or 23 m² per 40HQ, one unit at 42 m².
What private label also does not do is transfer certification. The EN 1090-1 factory production control certificate is issued to the plant that welds the frame, not to the brand that sells it. If you intend to issue your own declaration of performance, the plant has to be named in it and the assessment and verification route has to be settled with a notified body before the first order, not after. We have covered the custom-design route separately in the custom space capsule house guide, and the volume mechanics in the OEM MOQ, tooling and sampling breakdown; this article stays on the branding, packing and document layer.
Stock, OEM custom and private label compared
Buyers often ask for "private label" when they want one of three different things. Cost and timeline differ by an order of magnitude, so name which one you are buying before a quotation is issued.
| Stock model | OEM custom | Private label | |
|---|---|---|---|
| Drawings | Ours, unchanged | Your layout on our shell | Ours, unchanged |
| Minimum order | 1 unit | 1–5 units | 5 units |
| One-time cost | None | $2,000–9,000 tooling | $1,500–3,500 branding |
| Added lead time | None | 3–5 weeks | 10–15 days |
| Badge and serial | WEIGUAN | WEIGUAN | Your name, your numbering |
| Name on the EU declaration | Factory | Factory | Your company |
| Fits | Testing a market | A differentiated unit | Building a brand |
The 5-unit floor is not arbitrary. A plate die, a crate stencil and a manual print run are fixed costs; below five units the amortised line outruns the brand value, and above twenty it becomes noise.
The brand asset pack to send before the first artwork round
Artwork is where private-label schedules die, almost always because the file set arrives incomplete. Five items cover it.
- Logo as vector — AI, EPS or SVG, text converted to outlines. A 2,000 px PNG is not a production file, and no amount of tracing recovers a clean curve.
- Colour references, not screenshots — Pantone for print, RAL for powder coat. A screenshot carries whatever your monitor decided that day; a RAL number carries a paint code.
- Minimum reproduction width — state it. Below about 25 mm wide on an etched plate, counters in a fine logotype close up and the mark reads as a smudge at three metres.
- A placement map — one annotated elevation per model showing where the badge sits, and where it must not sit. Avoid the wet core wall and the panel joint 150 mm either side of a corner.
- Who signs off — one named person, one email thread. Two approvers in two time zones adds a week per round.
Our side runs three proof rounds as standard: layout on a flat PDF, then a photograph of the actual etched plate, then a plate on a finished panel. Physical proofs matter here because anodised aluminium shifts a warm grey about half a shade against a screen. Once the plate is cut and riveted, a change means a new die at $450–900 and another 7–10 days, so freeze artwork before the purchase order.
Where your brand physically appears on a pod
A pod has more brand surface than buyers expect, and each touchpoint is cheap enough that durability, not price, should decide it. Adhesive labels are the common mistake: on a south-facing panel, vinyl on a 60 °C surface yellows inside two seasons and lifts at the edge.
| Touchpoint | Method | Cost per unit | Lead time |
|---|---|---|---|
| Shell badge | 180 × 60 × 1.2 mm anodised aluminium, laser-etched, riveted | $25–60 | 7–10 days for the die |
| Serial and rating plate | 100 × 40 mm etched stainless: model, serial, electrical rating, IP rating, date code | $20–60 | Same run as the badge |
| Interior lining label | Woven or printed polyester, sewn into a lining seam | $3–8 | 5 days |
| Glazing identifier | UV-stable vinyl on the frame, never on the glass | $2–5 | None |
| Manual cover and spine | 24–40 page A5, your brand, language of the destination market | $8–15 | 5–8 days |
| Crate stencil | 100 mm letters, both long sides and one end | $12–25 | 3 days |
| QR plate | Etched code linking to your warranty or support page | $1–3 | None |
The serial plate is the one that earns its keep. A scheme such as WG-M10-26-0001 — plant, model, year, sequence — takes a comma in a spreadsheet and gives you a service history, a warranty start date and a spare-parts lookup five years later. Replace the prefix with your own and the scheme survives forty sites. Etching on tempered glass is not an option: the surface is under permanent stress and a laser mark at the edge is a crack waiting for a thermal cycle.
Packaging: crates, ISPM 15 and the container plan
A 20 m² pod ships flat: wall and roof panels, frame sections, glazing, wet core and fittings, broken down into three to four crates, the longest around 6.0 × 1.15 × 1.0 m. A 42 m² M42 smart standard unit fills a 40HQ on its own. Two 20 m² or 23 m² units fit a 40HQ: internal dimensions are 12.03 × 2.35 × 2.69 m, about 76 m³, and the pack is planned around the door aperture.
Solid-wood crates and pallets fall under ISPM 15. That means heat treatment to a 56 °C core temperature for at least 30 minutes, an IPPC mark on two opposite faces showing the country code, the registered producer number and the treatment code — CN-xxxxx-HT for heat treatment — applied permanently, never in red or orange and never on a paper label. Plywood, OSB and particle board are exempt because the pressing process already kills the pests, which is why most export crating for this product is built from plywood. A crate that arrives in Rotterdam or Savannah without a valid mark is your cost to return, not ours.
Inside the crate, panels are edge-protected with 5 mm EPE, faces separated by 0.2 mm PE sheet, and the whole pack wrapped before the lid goes on. Sea freight across 14–19 days picks up condensation, so we add 1 kg of desiccant per 2 m³ of crate volume and mark the crate with a humidity indicator card visible on opening. If the destination is the EU, note that the Packaging and Packaging Waste Regulation applies from 12 August 2026 and brings recyclability requirements and a heavy-metal limit of 100 mg/kg across the four metals; ask your packaging supplier for the declaration.
Your stencil goes on before the wrap, both long sides and one end, 100 mm characters, with the model, quantity, gross weight and handling marks.
The documentation that has to carry your name
This is the part that surprises first-time brand owners, and the part that is genuinely difficult to fix after the vessel sails. The rule in the EU is explicit: an importer or distributor that places a construction product on the market under its own name or trademark is considered the manufacturer and takes on the manufacturer's obligations under Article 22. Selling a Chinese-built pod as your own brand is exactly the case the article was written for.
| Document | Issued in whose name | What to settle |
|---|---|---|
| Private label agreement | Both parties | Trademark licence, ownership of the plate die, what happens to the tooling on termination |
| Declaration of performance | Your company, in the EU | Names the plant; technical file kept 10 years |
| Factory production control certificate | The plant | EN 1090-1 system 2+; cannot be reassigned to a brand |
| CE label content | Your company, plus plant address | CE, year first affixed, name, declaration number, notified body number; letters at least 5 mm high |
| Commercial invoice and packing list | Your company | Must reconcile with the ISF filing, line by line |
| ISF 10+2 | Importer of record | Manufacturer field is the plant, not your brand |
| Origin marking | Applied at the plant | 19 CFR 134.11, and 134.46 where your US name sits on the unit |
| Certificate of origin | Exporter, via CCPIT | Needed for preferential or quota treatment |
Two of those rows cause most of the trouble. First, the CE label: adding your name does not remove the plant's address or the notified body number, and the declaration number on the label has to match the declaration you actually hold. Second, the US origin rule. Under 19 CFR 134.46, if your brand name or a US city appears on the pod or its container in a way that could mislead the ultimate purchaser, the country of origin must appear in close proximity, in at least a comparable size, preceded by "Made in". A badge reading "Northline Pods, Denver" with no origin mark next to it is a marking notice waiting to happen, and 19 CFR 134.47 catches the same problem when the US location sits inside the trademark itself. Put "Made in China" into the badge artwork at the design stage; retrofitting it at the port means redelivery.
If your company is outside the EU, you also need an EU-established economic operator under Regulation 2019/1020, whose name and contact details appear on the product or its packaging alongside yours. This is paid in most member states; cost it before the first shipment.
Setup cost, unit cost and one landed example
The FOB price does not move for private label, because the bill of materials does not move. What you add is a fixed programme cost and a small per-unit delta. As of 2026 our planning figures are below; a custom RAL shell colour is the one change that touches the unit price, at $400–900 per pod.
| Line | Basis | Amount |
|---|---|---|
| Plate die and proofing | One badge, one serial plate | $450–900 |
| Crate stencil | One set, reusable | $150–400 |
| Manual layout and translation | One language | $250–600 |
| Artwork and proof rounds | Three rounds | $200–500 |
| Declaration and label re-issue | Administrative | $300–800 |
| Per-unit branded hardware | Badge, plate, manual, stencil | $65–160 per pod |
Ten M10 units at 20 m², branded, shipped to the US west coast, land like this:
| Line | Basis | Amount |
|---|---|---|
| FOB | 10 units at $17,800 | $178,000 |
| Ocean freight | 5 × 40HQ at $7,800 | $39,000 |
| Duty | 52.9% of FOB, HTS 9406.90.01 | $94,162 |
| Port, MPF, HMF, broker | Per entry | $5,500 |
| Branding programme | One-time | $2,800 |
| Total landed | $319,462 | |
| Per unit | $31,946 |
The 52.9% is the current stack for this heading: 2.9% most-favoured-nation, 25% Section 301 List 3 and 25% Section 232 metals, applied to the full customs value, unchanged as of November 2026. Freight is the number that moves most; the Drewry World Container Index put Shanghai–Los Angeles at $7,416 per 40-foot container in mid-November 2026 after a peak near $7,835 in June, so $7,500–8,500 is the sane planning band and $7,800 is what we quote against. The full component-level treatment sits in our space capsule house price guide.
Where the timeline actually slips
Not in production. A standard pod runs about 15 working days after drawing approval and deposit, and private-label branding adds 10–15 days. The slippage comes from four places: artwork that arrives as a raster file and has to be redrawn (3–5 days), three proof rounds with slow approvals (up to 10 days), manual translation (5–8 days), and a declaration re-issue that lands after the ISF filing window, which can hold the container at the load port. None are manufacturing problems, and all four are avoided by starting the brand pack at the quotation stage rather than the purchase order.
Frequently asked questions
What is the minimum order for a private label space capsule?
Five units. A stock unit starts at one, but a plate die, a crate stencil and a manual print run are fixed costs that only make sense across a small batch. Ten units is the more common first order because it fills five 40HQ containers at two pods each.
Who is the legal manufacturer if I sell a Chinese pod under my own brand in the EU?
Your company is. Article 26(1)(a) of Regulation (EU) 2024/3110 treats an importer or distributor that places a product on the market under its own name or trademark as the manufacturer, with the manufacturer's obligations under Article 22. The obligations apply from 8 January 2026, with the combined declaration of performance and conformity phasing in to January 2027.
Can the factory's CE certificate be reissued in my name?
Not as a transfer. The factory production control certificate belongs to the plant and stays with the plant. If you are the manufacturer under the regulation, you issue the declaration, name the plant in it, and settle with a notified body how the assessment and verification route is evidenced. Treat this as a two-to-four week exercise, not a document swap.
Do I have to print "Made in China" next to my brand name?
For the US, yes, if your brand name or a US location appears on the pod in a way that could mislead the purchaser. 19 CFR 134.46 requires the origin in close proximity, at least comparable in size, preceded by "Made in". Adding it to the badge artwork costs nothing; adding it at the port costs a redelivery.
Does private label change the FOB price?
No. The bill of materials is unchanged, so a branded M10 quotes at the same $17,800 per unit as the stock version at 10–19 units. Only a custom RAL shell colour moves the unit price, by $400–900 depending on batch size.
How long from order to a branded pod on site?
Roughly eleven to thirteen weeks: two to three weeks for artwork, plates and manuals, three weeks of production, then 14–19 days of ocean transit to a US west coast port, plus customs and inland delivery. Branding is not the long pole; artwork approval is.
Send a vector logo, a RAL or Pantone reference and the destination country, and we will return a plate layout, an FOB quotation and a document checklist within three working days. If you are still choosing a supplier, the questions in how to vet a Chinese capsule factory are worth asking first.