The claim on every prefab brochure is "installs in days". This page is the actual sequence, so you can plan a crew, a crane and a delivery window rather than hope.
The flat-packed kit arrives as a nested bundle. Before anything is unpacked, three things get checked: the pad level (plus or minus 10 mm across the footprint), the crane or telehandler position and reach, and the bundle sequence against the loading plan. Unpacking in the wrong order is what turns a two-day assembly into a four-day one.
The floor deck goes down on the galvanised sub-frame and is levelled and fixed at the foundation points. The corner posts and the wall frames follow, plumbed and temporarily braced. This is the only stage where the assembly is not self-supporting, and it is where a two-person crew becomes four.
Wall panels are lifted into place and fixed from inside; the wet-core module — factory-assembled with the shower tray, WC and basin already in — is set and connected. Because the wet core arrives as a unit, there is no on-site plumbing rough-in beyond the supply and waste connections.
Interior fit-out items that ship separately — furniture, blinds, appliances, skirting — are installed, the unit is cleaned, and commissioning is run: power on, water pressure test, drainage test, HVAC and fresh air, smart-control scene check, door and window operation, and a leak check on the glazing line.
Then it is habitable. Total elapsed time on site: two to three days with a crew of three to four.
Projects that run late almost always run late on the pad, not on the assembly. The kit is pre-cut and pre-drilled; the ground is the variable.
On a live site, installation time is revenue. A unit that is assembled in two days instead of six weeks can be sold into the current season rather than the next one, and it does not close the pool, the restaurant or the access road while it happens. That is the whole argument for the format.