Custom space capsule Apple Cabin prefab house, all-aluminum, soundproof & energy-saving. Fit for homestays, resorts, offices. OEM custom with solar system support.
CE marking is the first question a European importer asks and the last thing most suppliers can document properly. This page sets out what is actually certified, what the certificate covers, and what you still have to do at your end — because a CE certificate for a building product does not automatically make an installed unit compliant.
CE marking is a declaration by the manufacturer that the product meets the applicable harmonised standards, supported by a technical file. For a prefabricated unit the relevant framework is the Construction Products Regulation, and the standards engaged depend on the components — structural frame, envelope panels, glazing, electrical installation, and where applicable fire performance.
Our units ship with CE documentation and ISO certification for the production system. The technical file covers the structural system, the materials, the glazing specification and the electrical components used.
Being clear about this is more useful than a certificate presented as a blanket approval. Buyers who discover the gap at customs, or at the first inspection, lose more time than they would have spent asking.
Buyers often arrive looking for a "container cabin" and end up comparing it with a purpose-built capsule. The difference is worth understanding before the CE conversation, because it changes the documentation: a converted shipping container carries a CSC plate for transport but its building performance is whatever the conversion achieved, and the conversion is rarely covered by a construction product declaration. A purpose-built unit is designed as a building from the first drawing.
Capsule house versus space capsule home sets out the distinction, and shipping a space capsule overseas covers the import process including customs classification.
Tell us the destination country at enquiry stage. It determines the electrical standard (voltage, frequency, plug type, RCD arrangement), the glazing specification, and whether an additional test or calculation is needed. Getting that right before production is straightforward; correcting it after the container has landed is not. Standard production runs about 15 days after specification sign-off; FOB, CIF, CFR or EXW from Qingdao.

Ready to transform your space? Our team is here to help you.